Purpose: Used to define effective slab width for live loading only.
--> Given in girder input
Used for when a closing pour between girders is made after sequential pouring has been completed and thus all dead load stressing has already occurred (inches or mm). Can be given as one value for the whole girder or as a list of values to vary this width by tenth point.