Purpose: Used to indicate live loading is entirely from sidewalk(s) in Girder System Projects. (Not applicable to Line Girder Projects.)
--> Given in girder system input
Uses sidewalk loading as the only live load on the bridge. (Sidewalk(s) must be defined for this condition to be effective)